This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
Mining reports prices (April 2024 onwards)
CON29M Coal Mining Search – on the coalfield
This report provides information on past, present and future underground and opencast coal mining, mine entries, coal mining geology, coal mining subsidence claims, mine gas and surface hazards where applicable. The report delivers due diligence requirements, set by the Law Society, for conveyancing on the coalfield.
Product description | Boundary drawn by the customer | Boundary drawn by the Coal Authority | ||||
---|---|---|---|---|---|---|
Excluding VAT | VAT 20% | Total Fee | Excluding VAT | VAT 20% | Total Fee | |
Residential Report; between 0-15 hectares | £41.95 | £8.39 | £50.34 | £48.79 | £9.76 | £58.55 |
Non-Residential Report; between 0-15 hectares | £99.50 | £19.90 | £119.40 | £116.26 | £23.25 | £139.51 |
Non-Residential Report; between 15-50 hectares | £213.21 | £42.64 | £255.85 | £249.43 | £49.89 | £299.32 |
Non-Residential Report; between 50-100 hectares | £426.44 | £85.29 | £511.73 | £498.88 | £99.78 | £598.66 |
Non-Residential Report; between 100-150 hectares | £533.69 | £106.74 | £640.43 | £624.17 | £124.83 | £749.00 |
Non-Residential Report; between 150-200 hectares | £693.92 | £138.78 | £832.70 | £811.60 | £162.32 | £973.92 |
Non-Residential Report; between 200-250 hectares | £854.15 | £170.83 | £1,024.98 | £998.88 | £199.78 | £1,198.66 |
Non-Residential Report; between 250-300 hectares | £1,014.37 | £202.87 | £1,217.24 | £1,186.31 | £237.26 | £1,423.57 |
Non-Residential Report; between 300-350 hectares | £1,174.63 | £234.93 | £1,409.56 | £1,373.62 | £274.72 | £1,648.34 |
Non-Residential Report; between 350-400 hectares | £1,334.86 | £266.97 | £1,601.83 | £1,561.05 | £312.21 | £1,873.26 |
Non-Residential Report; between 400-450 hectares | £1,495.22 | £299.04 | £1,794.26 | £1,748.46 | £349.69 | £2,098.15 |
Non-Residential Report; between 450-500 hectares | £1,655.44 | £331.09 | £1,986.53 | £1,935.89 | £387.18 | £2,323.07 |
Non-Residential Report; per 500m for linear reports | £95.67 | £19.13 | £114.80 | £111.80 | £22.36 | £134.16 |
Ground Stability Report – on the coalfield
This report gives all the essential, due diligence information included in our CON29M report as well as property specific information on causes of natural subsidence, through our partnership with the British Geological Survey (BGS). This includes information on shrinkable clay, running sand, compressible and collapsible deposits, potential landslide activity and soluble rocks.
Product description: on the coalfield | Boundary drawn by the customer | Boundary drawn by the Coal Authority | ||||
---|---|---|---|---|---|---|
Excluding VAT | VAT 20% | Total Fee | Excluding VAT | VAT 20% | Total Fee | |
Residential Report; between 0-15 hectares | £72.70 | £14.54 | £87.24 | £90.72 | £18.14 | £108.86 |
Non-Residential Report; between 0-15 hectares | £158.38 | £31.68 | £190.06 | £198.37 | £39.67 | £238.04 |
Non-Residential Report; between 15-50 hectares | £341.74 | £68.35 | £410.09 | £427.34 | £85.47 | £512.81 |
Non-Residential Report; between 50-100 hectares | £684.98 | £137.00 | £821.98 | £854.66 | £170.93 | £1,025.59 |
Non-Residential Report; between 100-150 hectares | £856.00 | £171.20 | £1,027.20 | £1,068.29 | £213.66 | £1,281.95 |
Non-Residential Report; between 150-200 hectares | £1,113.01 | £222.60 | £1,335.61 | £1,388.77 | £277.75 | £1,666.52 |
Non-Residential Report; between 200-250 hectares | £1,370.14 | £274.03 | £1,644.17 | £1,710.47 | £342.09 | £2,052.56 |
Non-Residential Report; between 250-300 hectares | £1,627.13 | £325.43 | £1,952.56 | £2,029.73 | £405.95 | £2,435.68 |
Non-Residential Report; between 300-350 hectares | £1,884.26 | £376.85 | £2,261.11 | £2,350.21 | £470.04 | £2,820.25 |
Non-Residential Report; between 350-400 hectares | £2,141.27 | £428.25 | £2,569.52 | £2,670.81 | £534.16 | £3,204.97 |
Non-Residential Report; between 400-450 hectares | £2,398.39 | £479.68 | £2,878.07 | £2,991.30 | £598.26 | £3,589.56 |
Non-Residential Report; between 450-500 hectares | £2,655.38 | £531.08 | £3,186.46 | £3,311.77 | £662.35 | £3,974.12 |
Non-Residential Report; per 500m for linear reports | £154.56 | £30.91 | £185.47 | £193.91 | £38.78 | £232.69 |
Ground Stability Report – off the coalfield
This report gives all the essential, due diligence information included in our CON29M report as well as property specific information on causes of natural subsidence, through our partnership with the British Geological Survey (BGS). This includes information on shrinkable clay, running sand, compressible and collapsible deposits, potential landslide activity and soluble rocks.
Product description: off the coalfield | Boundary drawn by the customer | Boundary drawn by the Coal Authority | ||||
---|---|---|---|---|---|---|
Excluding VAT | VAT 20% | Total Fee | Excluding VAT | VAT 20% | Total Fee | |
Residential Report; between 0-15 hectares | £54.97 | £10.99 | £65.96 | £68.31 | £13.66 | £81.97 |
Non-Residential Report; between 0-15 hectares | £158.38 | £31.68 | £190.06 | £198.37 | £39.67 | £238.04 |
Non-Residential Report; between 15-50 hectares | £341.74 | £68.35 | £410.09 | £427.34 | £85.47 | £512.81 |
Non-Residential Report; between 50-100 hectares | £684.98 | £137.00 | £821.98 | £854.66 | £170.93 | £1,025.59 |
Non-Residential Report; between 100-150 hectares | £856.00 | £171.20 | £1,027.20 | £1,068.29 | £213.66 | £1,281.95 |
Non-Residential Report; between 150-200 hectares | £1,113.01 | £222.60 | £1,335.61 | £1,388.77 | £277.75 | £1,666.52 |
Non-Residential Report; between 200-250 hectares | £1,370.14 | £274.03 | £1,644.17 | £1,710.47 | £342.09 | £2,052.56 |
Non-Residential Report; between 250-300 hectares | £1,627.13 | £325.43 | £1,952.56 | £2,029.73 | £405.95 | £2,435.68 |
Non-Residential Report; between 300-350 hectares | £1,884.26 | £376.85 | £2,261.11 | £2,350.21 | £470.04 | £2,820.25 |
Non-Residential Report; between 350-400 hectares | £2,141.27 | £428.25 | £2,569.52 | £2,670.81 | £534.16 | £3,204.97 |
Non-Residential Report; between 400-450 hectares | £2,398.39 | £479.68 | £2,878.07 | £2,991.30 | £598.26 | £3,589.56 |
Non-Residential Report; between 450-500 hectares | £2,655.38 | £531.08 | £3,186.46 | £3,311.77 | £662.35 | £3,974.12 |
Non-Residential Report; per 500m for linear reports | £154.56 | £30.91 | £185.47 | £193.91 | £38.78 | £232.69 |
Enviro All-in-One Report – on the coalfield
This report combines the information included in our CON29M with a specialist environmental report from Groundsure. The report provides high value, property specific opinions and analysis of land use based on Groundsure’s historical land use database. The Enviro All-in-one fulfils the Law Society’s due diligence requirements for both coal mining and contaminated land searches.
Product description: on the coalfield | Boundary drawn by the customer | Boundary drawn by the Coal Authority | ||||
---|---|---|---|---|---|---|
Excluding VAT | VAT 20% | Total Fee | Excluding VAT | VAT 20% | Total Fee | |
Residential Report; between 0-15 hectares | £92.65 | £18.53 | £111.18 | £113.97 | £22.79 | £136.76 |
Non-Residential Report; between 0-15 hectares | £287.00 | £57.40 | £344.40 | £356.61 | £71.32 | £427.93 |
Non-Residential Report; between 15-20 hectares | £379.98 | £76.00 | £455.98 | £471.86 | £94.37 | £566.23 |
Non-Residential Report; between 20-30 hectares | £530.27 | £106.05 | £636.32 | £664.04 | £132.81 | £796.85 |
Non-Residential Report; between 30-40 hectares | £680.44 | £136.09 | £816.53 | £849.11 | £169.82 | £1,018.93 |
Non-Residential Report; between 40-50 hectares | £910.26 | £182.05 | £1,092.31 | £1,135.90 | £227.18 | £1,363.08 |
Enviro All-in-One Report – off the coalfield
This report combines the information included in our CON29M with a specialist environmental report from Groundsure. The report provides high value, property specific opinions and analysis of land use based on Groundsure’s historical land use database. The Enviro All-in-one fulfils the Law Society’s due diligence requirements for both coal mining and contaminated land searches.
Product description: off the coalfield | Boundary drawn by the customer | Boundary drawn by the Coal Authority | ||||
---|---|---|---|---|---|---|
Excluding VAT | VAT 20% | Total Fee | Excluding VAT | VAT 20% | Total Fee | |
Residential Report; between 0-15 hectares | £65.09 | £13.02 | £78.11 | £78.75 | £15.75 | £94.50 |
Non-Residential Report; between 0-15 hectares | £164.84 | £32.97 | £197.81 | £204.60 | £40.92 | £245.52 |
Non-Residential Report; between 15-20 hectares | £236.08 | £47.22 | £283.30 | £291.34 | £58.27 | £349.61 |
Non-Residential Report; between 20-30 hectares | £293.48 | £58.70 | £352.18 | £365.78 | £73.16 | £438.94 |
Non-Residential Report; between 30-40 hectares | £412.16 | £82.43 | £494.59 | £514.64 | £102.93 | £617.57 |
Non-Residential Report; between 40-50 hectares | £530.85 | £106.17 | £637.02 | £663.39 | £132.68 | £796.07 |
Consultants Coal Mining Report – on the coalfield
This report provides essential data and guidance on historic coal mining activity and the potential issues that could affect your client’s site and its surrounding area. The report pinpoints significant past activity or coal mining legacy management, which could have a significant impact on a development site. Each report will include information available on recorded and probable coal mining activity, investigations and remedial activity, coal mining geology, licensing and future mining activity, Coal Authority managed tips and mine water treatment schemes.
Product description | Boundary drawn by the customer | Boundary drawn by the Coal Authority | ||||
---|---|---|---|---|---|---|
Excluding VAT | VAT 20% | Total Fee | Excluding VAT | VAT 20% | Total Fee | |
Between 0-25 hectares | £134.58 | £26.92 | £161.50 | £153.10 | £30.62 | £183.72 |
Between 25-50 hectares | £269.15 | £53.83 | £322.98 | £306.21 | £61.24 | £367.45 |
Between 50-75 hectares | £403.74 | £80.75 | £484.49 | £459.31 | £91.86 | £551.17 |
Between 75-100 hectares | £538.31 | £107.66 | £645.97 | £612.42 | £122.48 | £734.90 |
Between 100-125 hectares | £672.90 | £134.58 | £807.48 | £765.52 | £153.10 | £918.62 |
Between 125-150 hectares | £807.48 | £161.50 | £968.98 | £918.63 | £183.73 | £1,102.36 |
Between 150-175 hectares | £942.06 | £188.41 | £1,130.47 | £1,071.73 | £214.35 | £1,286.08 |
Between 175-200 hectares | £1,076.64 | £215.33 | £1,291.97 | £1,224.84 | £244.97 | £1,469.81 |
Between 200-225 hectares | £1,211.22 | £242.24 | £1,453.46 | £1,377.94 | £275.59 | £1,653.53 |
Between 225-250 hectares | £1,345.79 | £269.16 | £1,614.95 | £1,531.06 | £306.21 | £1,837.27 |
Between 250-275 hectares | £1,480.36 | £296.07 | £1,776.43 | £1,684.16 | £336.83 | £2,020.99 |
Between 275-300 hectares | £1,614.94 | £322.99 | £1,937.93 | £1,837.24 | £367.45 | £2,204.69 |
Between 300-325 hectares | £1,749.52 | £349.90 | £2,099.42 | £1,990.35 | £398.07 | £2,388.42 |
Between 325-350 hectares | £1,884.11 | £376.82 | £2,260.93 | £2,143.45 | £428.69 | £2,572.14 |
Between 350-375 hectares | £2,018.68 | £403.74 | £2,422.42 | £2,296.56 | £459.31 | £2,755.87 |
Between 375-400 hectares | £2,153.27 | £430.65 | £2,583.92 | £2,449.66 | £489.93 | £2,939.59 |
Between 400-425 hectares | £2,287.84 | £457.57 | £2,745.41 | £2,602.78 | £520.56 | £3,123.34 |
Between 425-450 hectares | £2,422.42 | £484.48 | £2,906.90 | £2,755.88 | £551.18 | £3,307.06 |
Between 450-475 hectares | £2,557.00 | £511.40 | £3,068.40 | £2,908.98 | £581.80 | £3,490.78 |
Between 475-500 hectares | £2,691.57 | £538.31 | £3,229.88 | £3,062.08 | £612.42 | £3,674.50 |
Per 500m for linear reports | £128.17 | £25.63 | £153.80 | £145.82 | £29.16 | £174.98 |
No Search Certificate – off the coalfield
This is a formal document that states, based on the geography supplied and according to the information available at the time of the request, there are no known past, present or proposed workings of coal within the zone of likely physical influence of the property specified.
Product description | Boundary drawn by the customer | Boundary drawn by the Coal Authority | ||||
---|---|---|---|---|---|---|
Excluding VAT | VAT 20% | Total Fee | Excluding VAT | VAT 20% | Total Fee | |
Residential Certificate | £26.18 | £5.24 | £31.42 | £26.18 | £5.24 | £31.42 |
Non-Residential Certificate | £26.18 | £5.24 | £31.42 | £26.18 | £5.24 | £31.42 |
Added Value Reports
For use alongside our mining reports.
Product description | Boundary drawn by the customer | Boundary drawn by the Coal Authority | ||||
---|---|---|---|---|---|---|
Excluding VAT | VAT 20% | Total Fee | Excluding VAT | VAT 20% | Total Fee | |
Mine Entry Interpretive Report | £146.32 | £29.26 | £175.58 | £146.32 | £29.26 | £175.58 |
Mine Entry Plan & Data Sheets (minimum order charge, which includes up to 3 mine entries) | £66.68 | £13.34 | £80.02 | £66.68 | £13.34 | £80.02 |
Mine Entry Plan & Data Sheets (per additional mine entry, subject to the above minimum order charge) | £23.83 | £4.77 | £28.60 | £23.83 | £4.77 | £28.60 |
Subsidence Claims History | £195.69 | £39.14 | £234.83 | £195.69 | £39.14 | £234.83 |
Subsidence Claims 50m Buffer Report (per claim) | £22.60 | £4.52 | £27.12 | £22.60 | £4.52 | £27.12 |
Subsidence Claim Search | £22.60 | £4.52 | £27.12 | £22.60 | £4.52 | £27.12 |
Surface Hazard Incident Report | £133.39 | £26.68 | £160.07 | £133.39 | £26.68 | £160.07 |
Mine Gas Emission Report | £133.39 | £26.68 | £160.07 | £133.39 | £26.68 | £160.07 |